C_TS422_2020 Dumps for Pass Guaranteed - Pass C_TS422_2020 Exam 2021 [Q22-Q47]

Share

C_TS422_2020 Dumps for Pass Guaranteed - Pass C_TS422_2020 Exam 2021

C_TS422_2020 Exam Dumps - Try Best C_TS422_2020 Exam Questions from Training Expert Exams-boost

NEW QUESTION 22
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The cross-plant status
  • B. The most restrictive status
  • C. The plant-specific status
  • D. The least restrictive status

Answer: B

 

NEW QUESTION 23
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Consumption sequence procedure
  • C. Requirements type
  • D. Order type

Answer: C

 

NEW QUESTION 24
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning without final assembly (50)
  • B. Planning with final assembly (40)
  • C. Make-to-order production (20)
  • D. Make-to-stock production (10)

Answer: B

 

NEW QUESTION 25
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP group
  • B. MRP controller
  • C. MRP planning file
  • D. MRP type

Answer: B

 

NEW QUESTION 26
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. Alternative resources are fully occupied.
  • C. The work center has several individual capacities.
  • D. The Change Planning Direct on indicator is set.

Answer: A,C

 

NEW QUESTION 27
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Profile
  • C. MRP Controller
  • D. MRP Group

Answer: D

 

NEW QUESTION 28
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To reduce the number of changes required in bills of material
  • C. To increase the number of planning levels
  • D. Tosimplify the structure of bills of material
  • E. To reduce the number of material masters

Answer: A,B,D

 

NEW QUESTION 29
Where do you maintain the duration of a producton operation?

  • A. Work instructions
  • B. Bill of material (BOM)
  • C. Routing
  • D. Material master

Answer: C

 

NEW QUESTION 30
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 31
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 32
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Bulk materials
  • B. Waste products
  • C. By-products
  • D. Continuous flow materials
  • E. Co-products

Answer: B,C,E

 

NEW QUESTION 33
What is the purpose of collective orders?

  • A. To combine order management of co-products and by-products with the main product
  • B. To manage production orders for an entirefinished product on multiple levels
  • C. To post any component withdrawals single back flush with order confirmation
  • D. To post production costs ona cost collector instead of the production order

Answer: B

 

NEW QUESTION 34
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the routing
  • C. In the production version
  • D. In the production order type
  • E. In the bill of materials (BOM)

Answer: A,B,D

 

NEW QUESTION 35
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the reorder point.
  • B. Use the minimum order quantity.
  • C. Use the MRP type for vendor managed inventory.
  • D. Use the fixed lot size procedure.

Answer: D

 

NEW QUESTION 36
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Change of the storage bin
  • B. Creation of a purchasing contract
  • C. Change of the material'sprocurement type
  • D. Creation of a sales order
  • E. Creation of dependent requirements

Answer: C,D,E

 

NEW QUESTION 37
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Goods receipt processing time
  • C. Queue time
  • D. Float after production
  • E. Move time

Answer: C,D,E

 

NEW QUESTION 38
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific stock is created
  • B. Sales order-specific planning run is required.
  • C. Net requirements calculation is sales order-specific.
  • D. Production orders are created with sales order reference.
  • E. Storage location MRP areas are required.

Answer: A,C,D

 

NEW QUESTION 39
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether material numbers are assigned internally or externally
  • B. Whether a material master fieldis required, changeable, displayed, or hidden
  • C. Which transaction you can use to create a new material
  • D. Which material master views can be maintained

Answer: B,D

 

NEW QUESTION 40
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

  • A. Recipe approval (with Engineering Change Management)
  • B. Predefined GMP compliant process order types to meet audit requirements
  • C. Use of the GMP compliant flag in relevant master data applications
  • D. Documentation of quality data with Quality Management
  • E. Use of the digital signature function to check and run business processes

Answer: A,D,E

 

NEW QUESTION 41
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Planned order
  • B. Scheduling agreement schedule line
  • C. Purchase requisition
  • D. Production order
  • E. Stock transport order

Answer: A,B,C

 

NEW QUESTION 42
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Run MRP with automatic selection of production version.
  • B. Run PP/DS heuristics for repetitive manufacturing.
  • C. Assign planned orders manual lying the planning table.
  • D. Run MRP with quotaarrangement.

Answer: B,D

 

NEW QUESTION 43
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Installation point
  • B. Scrap percentage
  • C. Quantity
  • D. Item type

Answer: A,C

 

NEW QUESTION 44
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a planning group.
  • B. Use a resource group.
  • C. Use a heuristic.
  • D. Use a propagation range.

Answer: C

 

NEW QUESTION 45
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The lot size range must be within the lot-size range of the assigned routing.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C

 

NEW QUESTION 46
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

Answer: B

 

NEW QUESTION 47
......


C_TS422_2020 Exam Certification Details:

Cut Score:56%
Duration:180 mins
Level:Associate

 

Latest 100% Passing Guarantee - Brilliant C_TS422_2020 Exam Questions PDF: https://www.exams-boost.com/C_TS422_2020-valid-materials.html

Practice Examples and Dumps & Tips for 2021 Latest C_TS422_2020 Valid Tests Dumps: https://drive.google.com/open?id=1raVh5mHYJkTIILnpbEF5WGD4ICU7gP3r