[Nov-2021] Pass SAP C-TPLM30-67 Exam in First Attempt Guaranteed! [Q20-Q38]

Share

[Nov-2021] Pass SAP C-TPLM30-67 Exam in First Attempt Guaranteed!

Full C-TPLM30-67 Practice Test and 97 unique questions with explanations waiting just for you, get it now!

NEW QUESTION 20
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?

  • A. Maintenance planner group
  • B. Maintenance activity type
  • C. Priority
  • D. Main work center

Answer: A

 

NEW QUESTION 21
What all are the steps take part in external work center.
There are 2 correct answers to this question.
Response:

  • A. Process
  • B. Order
  • C. Structure
  • D. Technical completion
  • E. Notify

Answer: B,D

 

NEW QUESTION 22
Which steps must you perform to activate the usage history for equipment? (Choose two)

  • A. Activate the usage history for the equipment category.
  • B. Define history-related fields for the relevant equipment reference category.
  • C. Set the Usage History indicator for the maintenance plant.
  • D. Activate the usage history for each piece of equipment in the master record.

Answer: A,B

 

NEW QUESTION 23
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

  • A. Create a new technical object to represent the new measuring point.
  • B. Create a special measuring document and set the Counter Replacement indicator.
  • C. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
  • D. Dismantle the old measuring point and create a new measuring point.

Answer: B

 

NEW QUESTION 24
Which SC Series licenses are applied at the factory?

  • A. SC4020 and SC7020
  • B. SC8000 and SC9000
  • C. SCv2000 and SC8000
  • D. SC7020 and SCv2000

Answer: D

 

NEW QUESTION 25
Which command is used to set the eth0 IP address on an SC4020 controller?

  • A. ifconfig inet eth0 [IP address] [netmask] [gateway]
  • B. ifconfig inet eth0 [IP address/prefix length]
  • C. controller ipconfig eth0 [IP address] [netmask] [gateway]
  • D. controller ipconfig eth0 [IP address/prefix length]

Answer: B

Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/Dell-SC4020/td-p/5036791

 

NEW QUESTION 26
Which of the following are maintenance work center functions? (Choose three)

  • A. Costing
  • B. Capacity planning
  • C. Material planning
  • D. Production resources/tools (PRT) allocation
  • E. Scheduling

Answer: A,B,E

 

NEW QUESTION 27
All maintenance plans in your systems are scheduled automatically via deadline monitoring.
What happens when you set a manual call?

  • A. The original scheduled dates of the maintenance plan remain.
  • B. All scheduled calls on hold are deleted.
  • C. All scheduled calls on hold are skipped.
  • D. The waiting call dates are re-scheduled on the basis of the manual call.

Answer: A

 

NEW QUESTION 28
What does the functional location category determine? (Choose two)

  • A. The partner determination procedure
  • B. Whether you can create linear data for a functional location
  • C. Whether a fixed asset from Asset Accounting can be assigned
  • D. The functional location class

Answer: A,B

 

NEW QUESTION 29
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?

  • A. A framework order and a maintenance order for settlement
  • B. A framework order and a subcontract purchase order
  • C. A maintenance order for settlement and an outline agreement
  • D. A subcontract purchase order and an outline agreement

Answer: A

 

NEW QUESTION 30
How does SAP make new functions of the SAP ERP application available to customers?
Please choose the correct answer.
Response:

  • A. Via enhancement packages
  • B. Via best practices
  • C. Via Support Packages
  • D. Via add-ons

Answer: A

 

NEW QUESTION 31
What information does the value category provide in the maintenance order?
Please choose the correct answer.
Response:

  • A. The costs by work center
  • B. A summary of costs for multiple cost elements
  • C. The costs details for individual technical objects
  • D. The material costs by valuation category

Answer: B

 

NEW QUESTION 32
You are implementing a front-end connection in Legacy Port Mode on an SC4020 16 Gb FC array with two FC switches. Can full redundancy be achieved and if so, how many ports per switch can be used by the SC Series array?

  • A. Yes; eight ports on each of the FC switches
  • B. No; full redundancy cannot be achieved
  • C. Yes; two ports on each of the FC switches
  • D. Yes; four ports on each of the FC switches

Answer: C

 

NEW QUESTION 33
What options are available in the maintenance order when you analyze costs using value categories?
There are 2 correct answers to this question.
Response:

  • A. Display of costs by individual operations
  • B. Display of values in an alternate currency
  • C. Summary of actual costs across multiple cost elements
  • D. Display of costs by responsible work center

Answer: A,C

 

NEW QUESTION 34
Your customer uses the dynamic availability check for stock material.
Where does the system check material availability for an operation?

  • A. Only in the plant where the material has been reserved
  • B. In all plants where material inventory exists
  • C. Only in the plant where the material is flagged with the special stock indicator for maintenance stock
  • D. In all plants where the material is managed with serial numbers

Answer: A

 

NEW QUESTION 35
What is a licensed feature of Dell Storage Manager?

  • A. Data Reduction
  • B. Replication and Live Volumes
  • C. Data Center Bridging (DCB) Support
  • D. Storage-based Chargeback

Answer: D

Explanation:
Explanation/Reference: https://www.dell.com/support/manuals/us/en/04/storage-sc2020/sc-7.2-rn/sc7020-and-sc5020- features-and-licenses?guid=guid-951cc6b4-5d6e-4b46-8c72-a7f69514dd08&lang=en-us

 

NEW QUESTION 36
Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenance plan?

  • A. The cycle modification factor
  • B. The early and late shift factors
  • C. The call horizon
  • D. The early and late tolerance

Answer: A

 

NEW QUESTION 37
What is the purpose of the usage list for equipment history? (Choose two)

  • A. To display changes to history-related fields in an equipment master record
  • B. To track where the equipment was installed
  • C. To document the number of breakdowns for an object
  • D. To display the list of previous equipment operators

Answer: A,B

 

NEW QUESTION 38
......

Get Latest C-TPLM30-67 Dumps Exam Questions in here: https://www.exams-boost.com/C-TPLM30-67-valid-materials.html