NEW QUESTION # 28
Which of the following is a scheduling method for a production order?

  • A. Determination of basic dates
  • B. Key date scheduling
  • C. Determination of delivery date
  • D. Lead time scheduling

Answer: D


NEW QUESTION # 29
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Bill of material
  • B. Routings
  • C. Production order
  • D. Work center

Answer: A,B


NEW QUESTION # 30
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.

  • A. Form optimum sequences to reduce setup times
  • B. Execute an infinite production planning run for the critical resources
  • C. Increase the capacity supply in a time-phased interval
  • D. Reduce the planning time interval
  • E. Determine a time period with available capacity on the planning board

Answer: A,C,E


NEW QUESTION # 31
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?

  • A. The operation CANNOT be dispatched.
  • B. The operation is rescheduled backwards.
  • C. The operation is rescheduled in the planning direction.
  • D. The operation is rescheduled to an alternative work center.

Answer: C


NEW QUESTION # 32
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.

  • A. Purchase order
  • B. Scheduling agreement schedule line
  • C. Production order
  • D. Planned order

Answer: B,D


NEW QUESTION # 33
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is created.
  • B. A sales order is delivered.
  • C. MRP creates a dependent requirement.
  • D. MRP creates a planned order.

Answer: A


NEW QUESTION # 34
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

  • A. Assign the alert profile to the overall profile
  • B. Create an object selection variant for alerts according to the priority of ATP categories
  • C. Assign the overall profile to the authorization profile
  • D. Create an object selection variant for production-planning-related alerts

Answer: A,D


NEW QUESTION # 35
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.

  • A. Forecasting
  • B. Statistical procedures
  • C. Dependent requirements
  • D. Historical values
  • E. Planning file entries

Answer: A,B,D


NEW QUESTION # 36
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?

  • A. SAP Signavio Process Insights
  • B. SAP Signavio Process Governance
  • C. SAP Signavio Process Intelligence
  • D. SAP Signavio Process Manager

Answer: D


NEW QUESTION # 37
You are a consultant on an SAP S/4HANA Cloud greenfield project.
Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

  • A. Stability
  • B. Efficiency
  • C. Accuracy
  • D. Timeliness

Answer: A,B


NEW QUESTION # 38
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Requirements type
  • B. Order type
  • C. Requirements profile
  • D. Planning strategy

Answer: A,D


NEW QUESTION # 39
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the supplier to the production storage location
  • B. To control the flow of material from the central storage location to the production storage location
  • C. To control the flow of material from the supplier to the central storage location
  • D. To control the flow of material from the production storage location to the central storage location

Answer: B


NEW QUESTION # 40
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.

  • A. Material master
  • B. Routing
  • C. Work center
  • D. Production version

Answer: B,C


NEW QUESTION # 41
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.

  • A. To enable simple structuring of BOMs
  • B. To make the assignment of components easier
  • C. To make the procurement easier
  • D. To reduce the number of material masters

Answer: A,B


NEW QUESTION # 42
During production order creation, several valid production versions are found.
How does the system choose the production version?

  • A. Alphanumeric or quota arrangement
  • B. Validity period or sales order
  • C. Lot size or material cost
  • D. Planned order or material number

Answer: A


NEW QUESTION # 43
......