NEW QUESTION # 39
You want to use template to consider overhead during product costing. How do you assign the template to your material?
- A. Using a profit center and an overhead key
- B. Using an origin group and an overhead group
- C. Using a special procurement type and an overhead group
- D. Using an overhead group and an overhead key
Answer: D
NEW QUESTION # 40
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the planning profile of the order type.
- B. Set the relevant indicator in the controlling area.
- C. Set the relevant indicator in the internal order master record.
- D. Set the relevant indicators in the CO version.
Answer: C,D
NEW QUESTION # 41
In which module do you process profit center allocations in SAP S/4HANA?
- A. Product cost accounting
- B. General ledger accounting
- C. Cost center accounting
- D. Account-based profitability analysis
Answer: B
NEW QUESTION # 42
How can you populate local variables in Profitability Analysis reports?
- A. By user exit
- B. By Business Add-In
- C. By user entry during report execution
- D. By populating from user parameters
Answer: C
NEW QUESTION # 43
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value as a value field
- B. By defining the characteristic value as a key figure
- C. By defining the characteristic value in the check table
- D. By defining the characteristic value in the field catalog
Answer: C
NEW QUESTION # 44
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Use separate currency types within the same ledger for each valuation.
- B. Use separate CO versions for each valuation.
- C. Use separate segments for each valuation.
- D. Use separate ledgers for each valuation.
Answer: B,D
NEW QUESTION # 45
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
- A. MRP group -> Strategy group -> planning strategy -> requirements type
- B. MRP group -> requirements class -> planning strategy -> requirements type
- C. Strategy group -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements class -> requirements type
Answer: A,C
NEW QUESTION # 46
In a standard system delivery, how many free characteristics can be added to an operating concern?
- A. Over 150
- B. 0-70
- C. 101-150
- D. 71-100
Answer: B
NEW QUESTION # 47
Which field can you select for both reporting in costing based and account-based Profitability Analysis?
- A. Value in Controlling Area Currency
- B. Version
- C. Record type
- D. Cost element
Answer: B
NEW QUESTION # 48
You want enable WIP calculation in Product Cost by Period. What do you need to configure?
- A. Profitability Analysis (PA) transfer structure
- B. Variance variant
- C. Settlement profile
- D. Valuation variant
Answer: D
NEW QUESTION # 49
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. You can enter costs and revenues.
- B. You can define tolerance limits for plan overspend.
- C. Availability control can check against plan values.
- D. You can plan multiple versions.
Answer: A,D
NEW QUESTION # 50
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.
- A. The availability of funds on period level
- B. The availability of funds in object currency
- C. The availability of funds using overall plan value
- D. The availability of funds according to tolerance limits
Answer: B,D
NEW QUESTION # 51
You are running an indirect activity allocation. What do you post to the sender and receiver?
- A. You post both quantity and cost to the sender, and cost only to the receiver.
- B. You post both quantity and cost to the receiver, and cost only to the sender.
- C. You post quantity and cost to both the sender and receiver.
- D. You post only cost to both the sender and receiver.
Answer: C
NEW QUESTION # 52
You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.
- A. Requirements class
- B. Valuation variant
- C. Requirement type
- D. Account assignment category
- E. Costing type
Answer: A,C,D
NEW QUESTION # 53
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.
- A. It aims to match revenues for goods and services against sales-related expenses.
- B. It aims to summarize activity and situational change for a given organizational unit over a period of time.
- C. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
- D. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
Answer: A,D
NEW QUESTION # 54
......
SAP C_TS4CO_2021 certification exam consists of 80 multiple-choice questions that need to be answered within 180 minutes. C-TS4CO-2021 exam is available in English, Japanese, and Chinese languages, and it can be taken at any SAP certification center worldwide. C-TS4CO-2021 exam fee is around $550, and it is valid for two years from the date of certification.
Best Value Available! 2024 Realistic Verified Free C-TS4CO-2021 Exam Questions: https://www.exams-boost.com/C-TS4CO-2021-valid-materials.html
100% Accurate Answers! C-TS4CO-2021 Actual Real Exam Questions: https://drive.google.com/open?id=1wci1bBh6xuDA4Cpg3AB6F3ZI1HBsRDKM