SAP C-TS422-2021 certification exam is a 180-minute exam that consists of 80 multiple-choice questions. It is available in English and Japanese languages. C_TS422_2021 exam tests the candidate's knowledge of the SAP S/4HANA Production Planning and Manufacturing solution and its implementation and configuration.
NEW QUESTION # 29
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Planning mode
- B. Finiteness level
- C. Direction
- D. Fixed pegging
- E. Scheduling control
Answer: A,C,E
NEW QUESTION # 30
Why would you use phantom assemblies?
- A. To reduce the number of changes required in bills of materials
- B. To reduce the number of material masters
- C. To make the assignment of components easier
- D. To simplify the structure of bills of materials
- E. To increase the number of planning levels
Answer: A,C,D
NEW QUESTION # 31
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Supply Network Planning (SNP)
- C. Capacity Requirements Planning (CRP)
- D. Material Requirements Planning (MRP)
Answer: D
NEW QUESTION # 32
The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?
- A. Use the MRP type for vendor managed inventory.
- B. Use the reorder point
- C. Use the minimum order quantity
- D. Use the fixed lot procedure.
Answer: D
NEW QUESTION # 33
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple operations are maintained for one product
- B. When multiple production versions are maintained for one product
- C. When multiple planned orders exist on one resource
- D. When alternate resources are used within one operation
Answer: D
NEW QUESTION # 34
For what production type are production orders used?
- A. Replenishment controlled by control cycles
- B. Process manufacturing processes
- C. Period and quantity-oriented production
- D. Discrete manufacturing processes
Answer: D
NEW QUESTION # 35
What is a work center hierarchy in planning in SAP S/4HANA?
- A. A group of alternative work centers for production, structured in hierarchy levels by priorities
- B. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
- C. A group of work centers in a production line being used in sequence for production
- D. A group of alternative work centers providing a cumulative available capacity for production.
Answer: D
NEW QUESTION # 36
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a resource inbound in the location master.
- B. Model a transportation resorce in the location master.
- C. Model a handling resource in the location master and goods receipt time in the material master.
- D. Model a seperate resource in the production data structure.
Answer: B,C
NEW QUESTION # 37
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the maximum stock level
- B. Fill up based on the lot size procedure
- C. Fill up to the reorder stock level
- D. Fill up to the safety stoc level
Answer: B
NEW QUESTION # 38
What does forecasting in demand planning cycle include?
- A. One-off events
- B. Past sales order quantites
- C. Past quotation quantities
- D. Market intelligence
- E. Past procurment quantities
Answer: A,B,D
NEW QUESTION # 39
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?
- A. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
- B. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
- C. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
- D. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
Answer: B
NEW QUESTION # 40
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the batch information cockpit.
- B. Use batch determination.
- C. Use the material staging report.
- D. Use the material where-used report.
Answer: A
NEW QUESTION # 41
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Create object selection variant for product-related alerts.
- B. Assign the alert profile to the overall profile.
- C. Assign the overall profile to the authorization profile.
- D. Create object selection variant for transportation lane-related alerts.
Answer: A,B
NEW QUESTION # 42
What is the purpose of a reporting point confirmation in repetitive manufacturing?
- A. To stage different components for a production line simultaneously
- B. To provide timely updates of inventory management for the staged components
- C. To reduce the total production lead time for along production line
- D. To determine the work in progress along the production line
Answer: B,D
NEW QUESTION # 43
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you create a sales order
- B. When the MRP result are saved
- C. When you deliver a sales order
- D. When you create a planned order
Answer: A
NEW QUESTION # 44
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, printing, release, goods issue, confirmation, goods receipt
- B. Creation, release, settlement, goods issue, confirmation, goods receipt
- C. Creation, availability check, release, material widrawal, confirmation
- D. Creation, release, printing, goods issue, confirmation, goods receipt
Answer: C,D
NEW QUESTION # 45
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. Simultaneous
- B. By usage probability
- C. 100% check
- D. First in first out (FIFO)
Answer: B,C
NEW QUESTION # 46
When can the automatic material availability check occur in a production order?
- A. At order confirmation
- B. At order settlement
- C. At order release
- D. At order creation
Answer: C,D
NEW QUESTION # 47
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
- D. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
Answer: C
NEW QUESTION # 48
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with an alternative sequence in the routing
- B. A production line with more than one work center
- C. A production line with a parallel sequence in the routing
- D. A production line with prioritized alternative work centers
Answer: B
NEW QUESTION # 49
......
100% Pass Guarantee for C_TS422_2021 Exam Dumps with Actual Exam Questions: https://www.exams-boost.com/C_TS422_2021-valid-materials.html
Today Updated C_TS422_2021 Exam Dumps Actual Questions: https://drive.google.com/open?id=1C5GDdy74oF2nBH4LOC1rjJaiKhKahltk