Sample Questions of C_TS422_2021 Dumps With 100% Exam Passing Guarantee [Q14-Q30]

Share

Sample Questions of C_TS422_2021 Dumps With 100% Exam Passing Guarantee

Pass Key features of C_TS422_2021 Course with Updated 82 Questions


SAP C_TS422_2021 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA
Topic 2
  • Identify and explain production relevant master data
  • Configure availability check for components
Topic 3
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Capacity Planning in SAP S
  • 4HANA
Topic 4
  • Set up an order type, apply material staging and confirmation
  • Explain line load planning and confirmation
Topic 5
  • Determine master data objects for process orders
  • Introduction to SAP S
  • 4HANA Supply Chain Planning


The SAP C_TS422_2021 certification exam covers various topics, including demand management, material requirements planning, and production orders. The exam also covers topics related to master data management, production execution, and quality management. The exam consists of 80 multiple-choice questions that need to be completed in 180 minutes. To pass the exam, candidates must score at least 65%.


The SAP C_TS422_2021 certification exam is an essential requirement for professionals who want to excel in the field of SAP Production Planning and Manufacturing. The certification validates the skills and knowledge required to implement and configure SAP S/4HANA Production Planning and Manufacturing. It is an opportunity for professionals to enhance their career prospects and gain recognition for their expertise in the industry.

 

NEW QUESTION # 14
Which of the following questions do you have to answer before you start creating a BOM?

  • A. What status does the BOM have?
  • B. Which Valid To information is necessary?
  • C. Is the material type allowed in the BOM?
  • D. In which storage location is the BOM required?

Answer: B,C


NEW QUESTION # 15
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the special procurement key of the phantom assembly in the BOM.
  • B. Change the phantom item indicator for the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D


NEW QUESTION # 16
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

  • A. Net requirement calcualtion is sales-order specific.
  • B. A sales-order-specific planning run is required.
  • C. Storage location MRP areas are required.
  • D. Production orders specific stock is created

Answer: A,B,D


NEW QUESTION # 17
What is the purpose of collective orders?

  • A. To combine order management of co-products any by-products with the main product.
  • B. To post production costs on a cost collector instead of the production order
  • C. To post any component withdrawal as single backflush with order confiramtion
  • D. To manage production orders for an entire finished product on multiple levels

Answer: D


NEW QUESTION # 18
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Production order release
  • B. Backflushing
  • C. Material requirements planning
  • D. Kanban

Answer: C


NEW QUESTION # 19
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. MRP profile
  • B. MRP controller
  • C. Plants parameters
  • D. MRP group

Answer: D


NEW QUESTION # 20
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

  • A. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
  • B. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
  • C. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
  • D. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator

Answer: C


NEW QUESTION # 21
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use specific MRP controller
  • B. Use a specific material group
  • C. Use a specific material status
  • D. Use a specific MRP type

Answer: A,B


NEW QUESTION # 22
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Hybris
  • B. SAP SuccessFactors
  • C. SAP Ariba
  • D. SAP Fieldglass
  • E. SAP Concur

Answer: C,D,E


NEW QUESTION # 23
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using purchasing costs for automated source prioritization
  • B. Using quotations for internal and external procurement
  • C. Using stock transfer reservations for stock transfer
  • D. Using purchase orders for external procurement
  • E. Using run schedule quantities for in-house production

Answer: C,D,E


NEW QUESTION # 24
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
  • B. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.

Answer: D


NEW QUESTION # 25
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. Planed delivery time
  • B. In-house production time
  • C. Total replenishment lead time
  • D. Operation duration

Answer: A,B


NEW QUESTION # 26
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D


NEW QUESTION # 27
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The assigned routing must be a rate routing.
  • B. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • E. The assigned routing must NOT have alternative sequences.

Answer: B,C,D


NEW QUESTION # 28
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Supply Chain Management(SCM)
  • B. Integrated Business Planning (IBP)
  • C. Material Requirements Planning (MRP)
  • D. Capacity Requirements Planning (CRP)

Answer: A,B


NEW QUESTION # 29
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with a parallel sequence in the routing
  • B. A production line with an alternative sequence in the routing
  • C. A production line with prioritized alternative work centers
  • D. A production line with more than one work center

Answer: D


NEW QUESTION # 30
......

C_TS422_2021 Sample Practice Exam Questions 2023 Updated Verified: https://www.exams-boost.com/C_TS422_2021-valid-materials.html

Exam Study Guide Free Practice Test LAST UPDATED : https://drive.google.com/open?id=1C5GDdy74oF2nBH4LOC1rjJaiKhKahltk