NEW QUESTION 31
Test Management
You are the Test Manager of a new project aimed at developing a software system that must be certified at level B of the DO-178B standard. The project will follow a V-Model software development life cycle and it will have four formal levels of testing: component, integration, system and acceptance testing.
You must produce the test plan documentation for this project by providing an adequate coordination across the four levels of testing in order to assure auditability.
Which of the following answers would you expect to best describe how to organize the test plan?
Number of correct responses: 1
K3 2 credits

  • A. Produce a master test plan describing the relationship between the four levels, and four separate detailed level test plans, one for each level
  • B. Produce four separate detailed level test plans, one for each level, without a master test plan
  • C. Produce a master test plan that covers three levels (component, integration, system test) and a separate acceptance test plan
  • D. Produce a single master test plan that covers in detail all four levels, describing the particular activities for all test levels

Answer: A

 

NEW QUESTION 32
Test Management
Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?

  • A. Test reporting activities are still important with an iterative lifecycle. The reports can be used to conduct post-iteration review sessions before starting with the next iteration
  • B. Test reporting activities are less important for projects adopting an iterative life cycle model with short iterations. They should be performed at the end of the last iteration
  • C. Test reporting activities can't be influenced by the use of an iterative lifecycle model with short iterations
  • D. Test reporting activities are not important for projects adopting an iterative lifecycle model with short iterations

Answer: A

Explanation:
Section: Test Management

 

NEW QUESTION 33
You can count on well-written requirements, but you can't count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing.
Which of the following test activities would you expect to be the less important in this context?
Number of correct responses: 1
K4 3 credits

  • A. Extract from the defect tracking system of the previous project all the security defects and failures, and classify them to support design and execution of specific tests
  • B. Apply systematic and exploratory testing for integration and system test
  • C. Automate all functional and non-functional system tests
  • D. Perform exploratory testing sessions with adequate charters covering security aspects

Answer: C

 

NEW QUESTION 34
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.
The requirements specification document contains several SLAs
(Service Level Agreements) like the following:
SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.
Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?
K4 3 credits

  • A. Monitor the SLAs after the system has been released into the production environment
  • B. Perform unit performance testing for each single web service
  • C. Perform system performance testing, consisting of several performance testing sessions, to verify if all the SLAs have been met
  • D. Perform static performance testing by reviewing the architectural model of the system under various load levels

Answer: A

 

NEW QUESTION 35
Which of the following would you expect to be most likely an example of a motivating factor for testers?
K2 1 credit

  • A. The same regressions tests are executed manually by the same testers, for every product release, without any progression in content
  • B. The testers contribution to the quality of the software products developed from an organization is recognized with increased responsibilities
  • C. The resources allocated for the testing activities are not sufficient and don't allow the testers to contribute to the quality of the product
  • D. The testers are asked to perform, in parallel with their testing tasks, other tasks unrelated to their testing responsibilities

Answer: B

 

NEW QUESTION 36
Test Management
The following chart plots the cumulative number of defects opened against the cumulative number of defects closed during system testing of a software product.

Which of the following statements is true?
Number of correct responses: 1
K2 1 credit

  • A. The chart can be used to reveal test progress problems
  • B. The chart seems to indicate that the defect management process is not working well
  • C. The chart indicates that you have plenty of problems left to find
  • D. The chart seems to indicate that the defect management process is working well

Answer: D

 

NEW QUESTION 37
Assume that you are the Test Manager for a small insurance application development project.
You have decided to adopt a risk-based testing strategy: 5 product risks (R1, R2, R3, R4, R5) have been identified and their levels of risk have been assessed. 10 test cases (T1, ..., T10) have been designed to cover all the product risks.
The following table shows the risk level and the test cases associated to the identified product risks (higher risk level means higher risk):
You are not confident with the assessment of the risk level and you suspect that it will be possible to find high-priority bugs in low-risk areas.

Furthermore the period for test execution is very short. Your goal is to test all the product risks in a risk-based way, while assuring that each product risk gets at least some amount of testing.
Which of the following answers describes the best test execution schedule in this scenario?
K3 2 credits

  • A. T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
  • B. T10, T9, T8, T7, T6, T5, T4, T3, T2, T1
  • C. T1, T3, T5, T7, T9, T2, T4, T6, T8, T10
  • D. T10, T8, T6, T4, T2, T9, T7, T5, T3, T1

Answer: C

 

NEW QUESTION 38
Test Management
Assume you are managing the system testing phase of a project.
The system test execution period is scheduled to twenty weeks.
All tests are manual tests. You are following a risk-driven test approach.
During the last staff meeting the project manager tells you new deadlines that will not allow completion of all the system tests.
Which of the following would you expect to be the best way to respond to this situation?

  • A. Automate all remaining tests
  • B. Prioritize executing the tests for the highest product risks and track these risks
  • C. Remove testers from your test team, so that they can be assigned to other projects
  • D. No action is needed, test as much as possible in the remaining time period

Answer: B

Explanation:
Section: Test Management

 

NEW QUESTION 39
Test Management
Consider an agile team adopting Extreme Programming (XP) with five developers and one tester without any coding experience.
To which of the following activities would you expect the tester will contribute most?
Number of correct responses: 1
K2 1 credit

  • A. Executing unit tests
  • B. Developing unit tests
  • C. Supporting the customer in the execution of acceptance testing
  • D. Planning and executing tests during the integration test phase to detect interface defects

Answer: C

 

NEW QUESTION 40
An agile development team decides to hire a tester who has always workeD.
-
in independent test teams, reporting the problems found in a defect tracking system
-
in safety-critical projects, with a stronger focus on the quality of the product than on time and budget.
This agile team is focused on short-term goals to get the product released on time and within budget.
Which of the following answers would you expect to be most likely true in this scenario?
K2 1 credit

  • A. The developers will immediately follow the guidelines described by the tester
  • B. The tester's mission could be to verify adherence to requirements, instead of reporting formally the problems in a defect tracking system
  • C. Agile teams like the presence of a tester in their teams and the tester will be able to adapt to the new context without any issue
  • D. The tester can continue to report the problems found in a defect tracking system and be more focused on the quality than on time and budget constraints

Answer: B

 

NEW QUESTION 41
Defect Management
Consider a defect report and assume that a part of its lifecycle includes the following states:
New: Is the initial state
Working: Means that the developers are addressing the defect in order to produce a fix for the defect Clarification: Means that the developers need more information from the tester to address the defect and produce a fix for the defect and the tester is working to provide this information to the developers Verification: Means that a fix for the defect has been produced and the tester is running the adequate tests to verify whether the fix solves the defect
Closed: is the final state
Which of the following answers represents an invalid sequence of states that can't lead the bug report to the "Closed" state?

  • A. New, Working, Verification, Working, Clarification, Working, Closed
  • B. New, Working, Verification, Closed
  • C. New, Working, Verification, Working, Clarification, Working, Verification, Closed
  • D. New, Working, Clarification, Working, Verification, Closed

Answer: A

 

NEW QUESTION 42
Test Management
Which one of the following metrics to be produced needs traceability between the test cases and each item in a proper test basis?
Number of correct responses: 1
K2 1 credit

  • A. Mean time between failures for the system
  • B. Requirements coverage
  • C. Cumulative number of reported defects versus cumulative number of resolved defects
  • D. Trends in the lag time from defect reporting to resolution

Answer: B

 

NEW QUESTION 43
Which of the following statements best describes an appropriate approach for managing exploratory testing?
Number of correct responses: 1
K2 1 credit

  • A. Break the testing work in 30 to 120 minutes sessions and use properly defined mission statements consisting of two or three sentences to guide testing during these sessions
  • B. Define very generic charters to drive exploratory testing sessions of 2 days where testers are completely free to decide what to test
  • C. Exploratory testing should not be managed because such testing is inherently unmanageable and not measurable
  • D. Define very detailed mission statements, which allow testing work to be broken into sessions of up to 10 minutes duration in which testing is guided by these mission statements

Answer: A

 

NEW QUESTION 44
Test Management
Which of the following answers describes a factor that may reduce the effort spent when using distributed test teams without negatively affecting system quality?
Number of correct responses: 1
K2 1 credit

  • A. With several distributed test teams, every team assumes that some test conditions are covered by other teams but actually no one covers them
  • B. With several distributed test teams, two or more teams assume some test conditions are covered by their team and their team alone. But all of the teams actually cover them
  • C. Difficulties in communication between the distributed test teams due to time zone differences
  • D. With several distributed test teams, all of the distributed test teams use a single unified test dashboard

Answer: D

 

NEW QUESTION 45
You are the Test Manager for a project to develop a client-server application that allows wine vendors to order custom-assorted packages of wines of several winemakers to sell special packages in their wine shops.
You decide to apply a blended risk-based and reactive testing strategy. Below the exit criteria for the system testinG. EXCR1- Each "critical" quality risk item must be covered by at least one test condition EXCR2- Each "critical" requirement must be covered by at least one test condition
The following are the "critical" requirements of the application:
REQ-SEL-1. The application shall allow the user to order only one package at a time
REQ-SEL-2. The application shall allow the user to select between four different packages (2bottles, 6-bottles, 12-bottles, 15-bottles)
REQ-SEL-3. The application shall allow the user to order a package containing at least 1 bottle and no more bottles than the package size. No error messages shall be displayed if the user selects a valid number of bottles (at least 1 bottle and no more than the package size)
REQ-SEL-4. The application shall display an error message "Invalid number of bottles" if an invalid number of bottles is selected by the user (zero bottles or a number higher than the package size)
REQ-PAY-1. The application shall allow the user to pay with the three accepted credit cards (Visa, MasterCard, American Express)
REQ-PAY-2. The application shall display an error message "Invalid credit card" if invalid credit card data are given by the user
QUSTION NO: 11 The following is the unique "critical" quality risk item that has been identified: CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed
to get the number of bottles from the user
Test analysis for system testing has just begun and the following test conditions have been identifieD. TC-SEL-2. Test the selection of the package sizes
TC-SEL-4. Test wrong numbers of bottles for an order TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles from the user
Assume that you have used traceability to determine the logical test cases that cover all the requirements and the single risk item identified in that scenario.
Which of the following is a positive logical test that is complete and correct, and covers the REQSEL-4 requirement?
K3 2 credits

  • A. Select a 6-bottles package, then try to insert 7 bottles
  • B. Select a 6-bottles package, then try to insert 7 bottles; verify that the "Invalid number of bottles" message is displayed
  • C. Select a 6-bottles package, then try to insert 5 bottles; verify that no error messages are displayed
  • D. Select a 6-bottles package, then try to insert 7 bottles; verify that no error messages are displayed

Answer: B

 

NEW QUESTION 46
Test Management
Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?
Number of correct responses: 1
K2 1 credit

  • A. Test reporting activities are still important with an iterative lifecycle. The reports can be used to conduct post-iteration review sessions before starting with the next iteration
  • B. Test reporting activities are less important for projects adopting an iterative life cycle model with short iterations. They should be performed at the end of the last iteration
  • C. Test reporting activities can't be influenced by the use of an iterative lifecycle model with short iterations
  • D. Test reporting activities are not important for projects adopting an iterative lifecycle model with short iterations

Answer: A

 

NEW QUESTION 47
Test Management
In the test strategy document your organization declares:
- to adopt a V-model development lifecycle, with three formal levels of testing: unit, integration and system testing
- to use a blended risk-based and regression-averse testing strategy for each level of testing The following is an excerpt of the "approach" section for the system test plan document of a new project:
"Testing will only use manual tests. Due to the short period of time for test execution, the following activities will be performed in parallel with test execution: Test planning, test analysis and test design.
Basic metrics will be taken for test effort (i.e. person-hours), test cases executed (passed/failed), and incidents (no more metrics, such as code coverage, will be collected)." In the system test plan, no deviations from the test strategy are described.
Based only on the given information, which of the following statements is true?

  • A. The approach described in the system test plan document is consistent with the risk-based testing strategy, but it is inconsistent with the regression testing strategy
  • B. The approach described in the system test plan document is consistent with the regression testing strategy, but it is inconsistent with the risk-based testing strategy
  • C. The approach described the system test plan document is inconsistent with both the risk-based and regression testing strategies
  • D. The approach described in the system test plan document is consistent with the test strategy

Answer: C

Explanation:
Section: Test Management

 

NEW QUESTION 48
Test Tools and Automation
Assume you are the Test Manager in charge of independent testing for avionics applications.
You are in charge of testing for a project to implement three different CSCI (Computer Software Configuration Item):
- a BOOT-X CSCI that must be certified at level B of the DO-178B standard
- a DIAG-X CSCI that must be certified at level C of the DO-178B standard
- a DRIV-X CSCI that must be certified at level A of the DO-178B standard These are three different software modules written in C language to run on a specific hardware platform.
You have been asked to select a single code coverage tool to perform the mandatory code coverage measurements, in order to meet the structural coverage criteria prescribed by the DO-178B standard. This tool must be qualified as a verification tool under DO-178B.
Since there are significant budget constraints to purchase this tool, you are evaluating an open-source tool that is able to provide different types of code coverage. This tool meets perfectly your technical needs in terms of the programming language and the specific hardware platform (it supports also the specific C-compiler).
The source code of the tool is available.
Your team could easily customize the tool to meet the project needs. This tool is not qualified as a verification tool under the DO-178B.
Which of the following are the three main concerns related to that open-source tool selection?
Number of correct responses: 3
K4 3 credits (2 credits out of 3 credits correct, 1 credit point)

  • A. What are the costs to qualify the tool as a verification tool under the DO-178B?
  • B. Does the tool require a system with more than 4GB of RAM memory?
  • C. Is the installation procedure of the tool easy?
  • D. Is the licensing scheme of the tool compatible with the confidentiality needs of the avionics company?
  • E. Does the tool have a good general usability?
  • F. Does the tool support all the types of code coverage required from the three levels A, B, C of the DO-178B standard?

Answer: A,D,F

 

NEW QUESTION 49
Assume that no additional product risks have been identified during the first week of test execution.


Which of the following answers would you expect to best describe the residual risks associated with the identified product risks, at the end of the first week of test execution?

  • A. The test execution table doesn't give an indication of the risk level of the open defects and the test cases that failed or are not run yet
  • B. The residual risk level can't be determined, because it requires that all the test cases have been executed
  • C. Since R3 is the only risk for which all test cases have passed, the risk has been reduced by 20%
  • D. The test execution status table indicates that the risk has been reduced by 56%

Answer: A

Explanation:
Section: Testing Process

 

NEW QUESTION 50
People Skills - Team Composition
Your test team consists of four members (Mary, Bob, Mark, Dave) with different interpersonal skills.
The following skills assessment spreadsheet shows the characteristics of the team members with respect to a list of interpersonal-skills (for each characteristic only the member with the highest level of that characteristic is indicated and marked with 'X'):

On the next project a member of your test team will have to perform some routine tasks requiring collaboration with other teams.
Who in your test team would you expect to be most suitable at doing these tasks?
Number of correct responses: 1
K4 3 credits

  • A. Bob
  • B. Mary
  • C. Dave
  • D. Mark

Answer: B

 

NEW QUESTION 51
Consider the following test strategies:
I. Consultative test strategy
II. Reactive test strategy
III. Analytical test strategy
IV. Process-compliant test strategy
Consider also the following examples of test activities:
1.Prioritize the test cases, based on the results of a FMEA analysis, to ensure early coverage of the most important areas and discovery of the most important defects during test execution
2.Execute usability testing driven by the guidance of a sample of users (external to the test team)
3.Perform exploratory testing sessions throughout the system test phase
4.On an Agile project, execute tests that cover the test conditions identified for each user story of a feature planned for an iteration
Which of the following correctly matches each test strategy with an appropriate example?
K2 1 credit

  • A. I-2; II-3; III-4; IV-1
  • B. I-3; II-2; III-1; IV-4
  • C. I-2; II-3; III-1; IV-4
  • D. I-1; II-2; III-3; IV-4

Answer: C

 

NEW QUESTION 52
Test Management
Assume you are currently working on a project developing a system where functional requirements are very well specified. Unfortunately non-functional requirements do almost not exist.
You are the Test Manager. You have to choose a technique for test selection that allows testing of non- functional characteristics, especially reliability.
Which of the following techniques for test selection do you expect being most useful in this scenario?

  • A. Cause-effect graphing
  • B. Ambiguity reviews
  • C. A model-based technique based on the creation of operational profiles
  • D. Test condition analysis

Answer: C

Explanation:
Section: Test Management
Explanation/Reference:

 

NEW QUESTION 53
Test Management
Which one of the following metrics to be produced needs traceability between the test cases and each item in a proper test basis?

  • A. Mean time between failures for the system
  • B. Requirements coverage
  • C. Cumulative number of reported defects versus cumulative number of resolved defects
  • D. Trends in the lag time from defect reporting to resolution

Answer: B

Explanation:
Section: Test Management

 

NEW QUESTION 54
You are working on a project to develop an authentication system for an e-commerce website. This system provides two features: Registration and authentication. Two different development teams develop these two features.
There is a high likelihood that the delivery of the authentication feature to the test team will be three weeks later. To complete the registration the user must provide the following registration inputs: Name, surname, birth date, fiscal code and he/she can select a username and a password.
A registered user can be a special user or a normal user. To be identified as a special user, he/she must also provide, during the registration process, a voucher possibly received from the IT department.
Access is granted only if a user is registered and the password is correct: In all other cases access is denied. If the registered user is a special user and the password is wrong, a special warning is shown on the system console.
You are currently performing a quality risk analysis using FMEA.
Based only on the given information, which of the following is NOT a product risk that could be identified during the quality risk analysis?
K4 3 credits

  • A. The late delivery of the authentication feature to the test team causes delays in the start of test execution and this could result in a shorter test period
  • B. The authentication system denies access for a special user with a wrong password, but doesn't display a special warning on the system console
  • C. The authentication system grants access to a special user with a wrong password
  • D. The authentication system grants access to a normal user with a wrong password

Answer: A

 

NEW QUESTION 55
......


ISQI CTAL-TM_Syll2012 Exam Syllabus Topics:

TopicDetails
Topic 1
  • User acceptance testers and software developers
Topic 2
  • Advanced Level qualify cation is also appropriate for anyone who wants a deeper understanding of software testing.
Topic 3
  • Includes people in roles such as testers test analysts test engineers

 

Latest CTAL-TM_Syll2012 Pass Guaranteed Exam Dumps with Accurate & Updated Questions: https://www.exams-boost.com/CTAL-TM_Syll2012-valid-materials.html

CTAL-TM_Syll2012 Exam Brain Dumps - Study Notes and Theory: https://drive.google.com/open?id=1tWJR8QB_cu5W2ehel5ZrwWsVXfiOos65